Work here. Find the dream job you've always wanted.
quality
:Diploma / B.E. / B.Tech in Electrical Engineering, Electrical & Electronics Engineering
About the Role
We are looking for an experienced Electrical Quality Engineer / Quality Lead to take responsibility for electrical quality across the complete electrical panel assembly and testing process. Our company manufactures and supplies various HT/MV and LT electrical panels and assemblies. Electrical components and switchgear are procured from approved suppliers, while our manufacturing process includes wire processing, harnessing, labeling, electrical component installation, busbar/connection work, control wiring, assembly, testing and Factory Acceptance Testing (FAT). The candidate will be responsible for ensuring that completed panels are electrically correct, fully functional and compliant with approved drawings, specifications, applicable standards and customer requirements.
Key Responsibilities
1. Incoming Electrical Component Quality
Inspect and verify purchased electrical components against: Approved BOM, Purchase specifications, Approved makes, Model numbers, Ratings, Technical specifications, and Approved drawings. Components may include: Circuit breakers, Switchgear, Contactors, Relays, Protection devices CTs/VTs where applicable, Meters, Terminal blocks, Control components, Cables, Wires, Lugs, Ferrules, Cable glands, Connectors, Insulators, Busbar materials, Other electrical accessories.
Verify quantity, identification, physical condition and required certificates/documents. 2. Electrical Drawing & BOM Verification Ensure assembly is carried out strictly according to: Single Line Diagrams, Wiring diagrams, Control schematics, GA/component, layout drawings, BOM, Terminal plans, Interconnection drawings, and Customer approved drawings
Verify correct component, rating, location and connection.
3. Wire Harness & Control Wiring Quality
Control the complete wire processing process which may include: Wire cutting, Stripping,Ferrule printing, Ferruling, Lug, selection, Crimping,Sleeving, Wire identification, Harness preparation,Routing, Termination, Labelling etc.
Verify: Wire size, Wire colour, Ferrule number, Terminal number, Component terminal, Correct lug/ferrule, Crimp quality, Strip length, Wire dressing, Routing and segregation, name. etc.
Implement appropriate:
Pull testing
Continuity testing
Point to point verification
Visual inspection
4. Electrical Assembly Quality
Inspect electrical assembly that may include: Electrical components, Switchgear, Contactors, Relays, Protection devices, Meters, Terminal blocks, Busbars, Insulators, Cable ducts, Control wiring, Power wiring, Cable glands, Terminations, Earthing, Labels, Nameplates
Verify proper mounting, identification and connections.
5. Busbar & Power Connection Quality
Inspect: Busbar material, Busbar size, Configuration, Phase identification, Insulation, Supports, Clearances, Joints, Hardware, Cable lugs, Crimping, Connection, torque etc.
Implement controlled torque procedures using calibrated torque wrenches.
Ensure appropriate torque marking/witness marking and records for critical connections.
6. Electrical Testing
Plan, supervise and/or perform testing of completed panels according to panel type and project requirements. Testing may include:
Continuity testing
Insulation Resistance testing
High Voltage / Dielectric Withstand testing
Earth continuity
Functional testing
Control circuit testing
Trip/close circuit verification
Protection circuit verification
Interlock verification
Operational testing
Timing tests where applicable
Metering verification
Indication testing
Alarm/annunciation testing
Control logic testing
Communication/interface testing where applicable
Ensure test procedures and acceptance criteria are based on applicable standards, approved drawings, equipment ratings, manufacturer requirements and customer specifications.
7. Pre FAT Inspection
Conduct a complete internal inspection before customer FAT.
Verify:
Mechanical completion
Electrical completion
Wiring
Terminations
Labels
Component identification Testing completion Functional operation Documentation
Ensure all internal NCRs and punch points are closed before customer inspection.
8. Factory Acceptance Testing — FAT
Lead or coordinate electrical FAT with: Customers Consultants Third party inspectors
Responsibilities include: Preparing FAT checklists Demonstrating panel functionality Demonstrating control/protection functions Performing required tests Recording results Handling customer observations Closing FAT punch points Preparing test certificates and reports
The objective is to achieve a high first pass FAT rate and minimize avoidable customer observations.
9. Electrical NCR & CAPA
Handle electrical quality problems including: Wiring errors Wrong components Wrong ratings Wrong ferrules Wrong terminations Loose connections Crimping defects Testing failures Functional failures Drawing related errors Customer FAT observations
Conduct:
5 Why 8D Root Cause Analysis Corrective Action Preventive Action
Track effectiveness and recurring defects.
10. Quality Documentation
Prepare and maintain: Incoming Electrical Inspection Reports Wiring Inspection Checklists Harness Inspection Records Torque Records
Electrical Test Reports IR Test Reports HV Test Reports where applicable Functional Test Reports FAT Reports NCR Reports CAPA Records Final Inspection Reports Routine Test Certificates Quality dossiers/documents required for dispatch
11. Testing Equipment & Calibration
Maintain proper calibration and control of: Megger / IR testers HV test equipment Multimeters
Continuity testers Electrical test equipment Torque wrenches Crimp testing equipment Other electrical measuring instruments
Ensure all critical testing equipment is calibrated and within validity.
12. Process Improvement Identify and reduce: Wiring errors Wrong components Wrong component ratings Ferrule errors Crimping defects Loose connections Torque related failures Testing failures Functional failures Rework Customer FAT observations Customer NCRs Repeat electrical defects Required Technical Skills Candidate should have strong practical knowledge of: HT/MV and LT electrical panels Electrical panel assembly Control wiring Wire harnessing Ferruling Crimping Cable termination Busbars Electrical components Protection/control circuits Electrical testing Electrical schematics SLDs Wiring diagrams BOMs Terminal plans FAT NCR/CAPA Root Cause Analysis Standards & Compliance Working knowledge of applicable IS, IEC and customer/project standards relating to electrical panels, assemblies, testing and safety. Knowledge of applicable standards such as: IEC 61439 IEC 62271 series, where applicable to the equipment supplied Relevant Indian Standards Customer/project specific specifications The candidate should be able to determine the appropriate testing and acceptance criteria based on the specific equipment, ratings, design and project requirements. Preferred Experience Experience in HT/MV and LT electrical panel manufacturing, panel assembly, control panel wiring, electrical testing and FAT will be preferred. Candidates who have worked in panel manufacturing companies as Electrical Quality Engineer, Electrical QC Engineer, Testing Engineer, FAT Engineer or Electrical Quality Lead would be suitable. Key Performance Indicators Electrical First Pass Yield, Customer FAT First Pass Rate, Wiring defect rate, Crimping/termination defect rate, Testing failure rate, Internal electrical NCR rate, Customer electrical NCR rate, Rework percentage, Repeat defect rate, FAT observation rate, CAPA closure performance, Customer complaint recurrence. Key Competencies Strong practical electrical knowledge Excellent drawing reading ability Strong troubleshooting skills Hands on testing experience Attention to detail Root Cause Analysis Quality documentation Customer/consultant handling Ability to train electrical assembly technicians Strong communication skills Ability to work closely with Engineering, Purchase, Stores, Fabrication, Assembly and Testing teams Primary Objective To ensure that every completed electrical panel is correctly wired, correctly assembled, electrically safe, fully functional, properly tested and compliant with approved drawings, applicable standards and customer requirements before FAT and dispatch.